Monday, November 7, 2011

renders






revit - 3d view









site plan

seating arrangement and flexability



the seating arrangement is flexible in a way that the ground seating formation can be removed and the space which was previously occupied can open up briefly, however the concept of the lower grandstand structure being able to fold up and allow a more in depth open space below which could open up also to either exhibition type space beside this main theater hall was one of the key ideas that came across during the concept phase of the complex. the image above demonstrates a brief understanding of the way the structure can be moved.

Sunday, November 6, 2011

First Round - Physical model

these images are of a physical model built to explore the canopy that covers either side of parliament house.....






Saturday, November 5, 2011

public connections

the design focuses on reactivating the connection paths with the existing structure and creating a new space that will drive visitors to want to explore the space further....

Friday, November 4, 2011

regenerating the heart

the design aims to regenerate the spaces in front of the forecourt in producing the 'NEW HEART' to parliament house in terms of public connectivity and activity.....